Realizations
Construction of a power unit for PEC Wyszków.
Reconstruction and expansion of the existing Municipal Wastewater Treatment Plant in Łyse.
Execution of I&C (AKPiA) and electrical works within the project: “Design and construction of a comprehensive gas-fired hot-water heat plant with capacity up to 20 MW (fuel input), with an option to expand by another 20 MW, at PGE Energia Ciepła S.A., Bydgoszcz CHP Branch.”
Overhaul of the automation system of the palletizing line at Prefabet S.A., Osława Dąbrowa plant.
Supply, installation and commissioning of control cabinets RSK16, RSK17, RSK18 and switchboards RK16, RK17, RK18 for the project: Construction of KGO at EC Pruszków (LOOS).
Supply and commissioning on site of 3 power-and-control cabinets for BOSCH hot-water boilers for the KRS construction at EC Gdynia.
Supply and commissioning on site of 3 power-and-control cabinets for BOSCH hot-water boilers for the KRS construction at EC Kalisz, under the contract executed by Loos for ERBUD titled: “Construction of a reserve/peak oil-and-gas hot-water boiler plant with two boilers of approx. 20 MWt each and one boiler of approx. 10 MWt, together with the necessary civil and technological infrastructure in Kalisz.”
Execution of a complete control system for the Warehouse-Paul-Weinig panel transport line in the Padma Production Plant in Suwałki
Development and delivery of a machine for the assembly of o-rings on plastic plugs and automation of the plug tightening process
Prefabrication of Sivacon S8 MCC board