Supply and commissioning on site of 3 power-and-control cabinets for BOSCH hot-water boilers for the KRS construction at EC Kalisz, under the contract executed by Loos for ERBUD titled: “Construction of a reserve/peak oil-and-gas hot-water boiler plant with two boilers of approx. 20 MWt each and one boiler of approx. 10 MWt, together with the necessary civil and technological infrastructure in Kalisz.”

APS Shop Kalibracja APS
Kalibracja
Skip to content