Execution of I&C (AKPiA) and electrical works within the project: “Design and construction of a comprehensive gas-fired hot-water heat plant with capacity up to 20 MW (fuel input), with an option to expand by another 20 MW, at PGE Energia Ciepła S.A., Bydgoszcz CHP Branch.”

APS Shop Kalibracja APS
Kalibracja
Skip to content