ENERGOTECHNIKA – ENERGOROZRUCH SA
Execution of I&C (AKPiA) and electrical works within the project: “Design and construction of a comprehensive gas-fired hot-water heat plant with capacity up to 20 MW (fuel input), with an option to expand by another 20 MW, at PGE Energia Ciepła S.A., Bydgoszcz CHP Branch.”