Realizations
Provision of maintenance services in the scope of removing defects and failures and performing maintenance works and inspections of protection circuits, electric controls and ICA system in the period in Enea Ciepło Sp. z o.o. Białystok Heat and Power Plant Branch
Design, UDT approvals and execution of the boiler safety automation in accordance with UDT requirements, to limit the boiler thermal capacity to 4.9 MW.
Control system for the “carton palletizing system” at the production plant of Padma Sp. z o.o. sp.k. in Suwałki.
Execution of automation for the palletizing line at the SILIKATY Białystok facility.
Supply, installation and commissioning of power-and-control cabinets for gas-oil boilers K4 and K5 at “Zachód” Heat Plant in Białystok.
Execution of I&C (AKPiA) installation for the oil pumping station, two tanks and oil tray — “Zachód” Heat Plant in Białystok.
Electrical, I&C (AKPiA) and control works within the project: Reconstruction (replacement—dismantling and construction) of coal-fired boilers WRm 40 No. K-4 and WRp 40 No. K-5 into gas and/or oil-fired boilers, including flue gas discharge via two steel stacks on a shared reinforced-concrete foundation, and construction of fuel-oil storage and distribution installation at “Zachód” Heat Plant.
Automation and robotization of the production process toward Industry 4.0 at the production plant in Łapy.
Replacement of the main LV switchboard, replacement of three transformers, modernization of the reactive power compensation system.
Electrical and I&C (AKPiA) works within the investment project: construction of a gas CHP plant at the facility — Cukrownia Miejska Górka (sugar factory).