Years
Investor / Object
Category
Description
since 1994
Enea Ciepło Sp. z o.o.
Heat and power plants

Provision of maintenance services in the scope of removing defects and failures and performing maintenance works and inspections of protection circuits, electric controls and ICA system in the period in Enea Ciepło Sp. z o.o. Białystok Heat and Power Plant Branch

2025
Miejskie Przedsiębiorstwo Energetyki Cieplnej S.A. w Bielsku Podlaskim
Heating Plants

Design, UDT approvals and execution of the boiler safety automation in accordance with UDT requirements, to limit the boiler thermal capacity to 4.9 MW.

2024 - 2025
AGEMAR Sp. z o.o.
Industry

Control system for the “carton palletizing system” at the production plant of Padma Sp. z o.o. sp.k. in Suwałki.

2024 - 2025
LIN-TECH Sp. z o.o.
Industry

Execution of automation for the palletizing line at the SILIKATY Białystok facility.

2024 - 2025
ENERGOSERWIS S.A.
Heating Plants

Supply, installation and commissioning of power-and-control cabinets for gas-oil boilers K4 and K5 at “Zachód” Heat Plant in Białystok.

2024 - 2025
ENERGOTECHNIKA-ENERGOROZRUCH S.A.
Heating Plants

Execution of I&C (AKPiA) installation for the oil pumping station, two tanks and oil tray — “Zachód” Heat Plant in Białystok.

2024 - 2025
UNIBEP S.A.
Heating Plants

Electrical, I&C (AKPiA) and control works within the project: Reconstruction (replacement—dismantling and construction) of coal-fired boilers WRm 40 No. K-4 and WRp 40 No. K-5 into gas and/or oil-fired boilers, including flue gas discharge via two steel stacks on a shared reinforced-concrete foundation, and construction of fuel-oil storage and distribution installation at “Zachód” Heat Plant.

2024 - 2025
KONEKT Sp. z o.o.
Industry

Automation and robotization of the production process toward Industry 4.0 at the production plant in Łapy.

2024 - 2025
PPB PREFBET Spółka z o.o.
Industry

Replacement of the main LV switchboard, replacement of three transformers, modernization of the reactive power compensation system.

2023 - 2025
ERBUD S.A.
Industry

Electrical and I&C (AKPiA) works within the investment project: construction of a gas CHP plant at the facility — Cukrownia Miejska Górka (sugar factory).

APS Shop Kalibracja APS
Kalibracja
Skip to content
APS Automatyka-Pomiary-Sterowanie - Białystok
Privacy Overview

This website uses cookies to provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.