Sklep internetowy - APS SA

SHOP ONLINE

REALIZATIONS

Automatyka-Pomiary-Sterowanie S.A. performed the instrumentation systems on the new 10 MW power unit in the PEC Suwałki.

 

ccThe scope of work performed by the company included:

1. Supply of measuring equipment and wiring
2. Delivery of cable routes
3. Assembly work of the DCS system cabinet
4. Installation works of cable wiring and cable routes
5. Assembly work of measuring apparatus
6. Start-up of the measurement systems
7. Start-up of adjustment and control systems
8. Participation in start-up of the unit

 

 

nastawnia

piecn

 

 

ul. A. Mickiewicza 95F 15-257 Białystok
tel. +48 (85)74 83 400
fax: +48 (85) 74 83 419