Automatyka-Pomiary-Sterowanie S.A. performed the instrumentation systems on the new 10 MW power unit in the PEC Suwałki.
The scope of work performed by the company included:
1. Supply of measuring equipment and wiring
2. Delivery of cable routes
3. Assembly work of the DCS system cabinet
4. Installation works of cable wiring and cable routes
5. Assembly work of measuring apparatus
6. Start-up of the measurement systems
7. Start-up of adjustment and control systems
8. Participation in start-up of the unit